How to Specify a Tube Sealing Machine: The Five Numbers

TY-001 ultrasonic tube sealing machine, side view

To specify a tube sealing or filling machine you need five numbers: tube diameter, tube length, tube construction, fill volume, and required output per shift. Everything else — tooling, dosing system, automation level, price — follows from those five. Get two of them wrong and the machine arrives unable to run your own tube.

Tube sealing machine assembled and standing on the workshop floor at the Guangzhou factory, with other machines in the background
A sealed tube is sized by two numbers only: sealing diameter and overall length. Everything else in the specification follows from those.

1. Tube diameter and length

These two numbers decide the tooling, and the tooling is the part that cannot be improvised after delivery. A machine quoted for 15–50 mm sealing diameter needs a different jaw and fixture set at each end of that range, and the fixture is what holds the tube square to the sealing head.

Measure the tube you actually buy, not the tube you plan to develop. Then measure the extremes of your range, because the widest tube you will ever run is the one that sets the tooling cost. If your range spans more than about 20 mm in diameter, expect the supplier to quote two tooling sets rather than one.

The mistake to avoid

Buyers often quote the diameter of the cap, or the diameter printed on the tube carton, rather than the sealing diameter at the tail. On a tapered tube those are three different numbers. Measure the flat width of the tail and double it, or send the supplier a physical tube.

2. Tube construction — this decides the sealing process

The wall material determines whether the tail is closed by ultrasonic welding, by folding and crimping, or by hot-jaw sealing. It is not a preference; the material only accepts one of them properly.

Tube construction Typical use Sealing method
Extruded plastic (PE, PP) Cosmetics, gels, household Ultrasonic weld, then trim
Plastic barrier laminate (PBL) Toothpaste, creams, all-plastic barrier Ultrasonic weld
Aluminium barrier laminate (ABL) Pharmaceuticals, oral care, adhesives Weld or fold, depending on the lacquer
Pure aluminium Ointments, traditional pharma Fold and crimp only
Dual-chamber (mother-and-child) Two-formula cosmetics, adhesives Weld, with the septum kept intact

If you are unsure which construction your tube is, cut one open. A metal foil layer is visible in ABL; pure plastic shows a uniform wall.

Send the supplier the tube datasheet if you have one. If you do not, send three tubes. A tube in the hand settles in thirty seconds what a week of email cannot.

3. Fill volume and product behaviour

Fill volume sets the dosing system. Two fills of the same volume can need different equipment because of viscosity, and viscosity is the number buyers most often leave out of an enquiry.

  • Thin liquids and lotions need a positive-displacement or flow-meter system; a simple piston will drip and give inconsistent weights.
  • Pastes and gels suit a piston filler with a follow-plate or a hopper with agitation, so the product does not bridge.
  • High-viscosity ointments and adhesives need a larger bore piston and heated or pressurised feeding, otherwise the fill time becomes the bottleneck rather than the machine cycle.
  • Products with particles need a valve design that will not crush or block, and the fill accuracy figure the supplier quotes will almost always be wider than for a smooth paste.

Ask for the fill accuracy as a tolerance on your product, at your fill volume, verified by weighing twenty consecutive tubes. A number quoted without a test method is not a specification.

4. Output per shift

Do not specify tubes per minute. Specify tubes per shift, then divide by the hours you actually run. A machine that claims 15 tubes per minute will not deliver 7,200 tubes in an eight-hour shift, because changeovers, breaks, cleaning and the occasional jam all take time out of the clock.

A realistic planning figure is sixty to seventy percent of the nominal rate over a full shift. If you need 8,000 tubes a day, plan for a machine whose nominal output is comfortably above that, not exactly at it.

5. Utilities and floor space

These are the two items that turn a good quote into a delayed installation. Confirm them against the building you actually have, not the building you plan to move into.

  • Electrical supply and phase — single phase and three phase machines are not interchangeable, and a voltage change after the build is expensive.
  • Compressed air pressure and consumption — most tube stations need 0.5–0.8 MPa, but consumption varies with cycle rate.
  • Floor loading and levelling — an automatic line with a magazine and conveyor is heavy and needs a level floor, not a mezzanine.
  • Clearance for guard opening and maintenance access — a machine that fits the room but cannot be opened for cleaning is a problem.

What to put in the enquiry

A single email with these six items will get you a firm quote instead of a range:

  1. Tube drawing or three physical samples, with the sealing diameter and total length marked.
  2. Tube construction (material and layer structure) if known.
  3. Product name, viscosity or a description of behaviour (pours, spreads, stands up in the tube).
  4. Fill volume per tube and the tolerance you must hold.
  5. Required output per shift, and the number of different products you change between.
  6. Destination country and site voltage, so the electrical build is right first time.

The two questions buyers most often forget

First: what happens at the start of a run? The first tubes after a changeover are usually scrap while registration and dose settle. Ask how many, because that number multiplied by your changeover frequency is a real annual cost.

Second: what is the wear part list and lead time? Jaws, sealing horns, trimmers and gripper pads all wear. A machine with a six-week lead time on its consumable is a machine that stops production for six weeks, eventually. Ask for the list and the price before you order, and order a spare set with the machine.

Questions buyers ask before ordering

Can one machine cover several tube sizes?
Yes, within a range — but the tooling changes with the diameter, and sometimes with the tube length too. Ask for the tooling matrix: which diameters share a set and which need their own. That matrix, not the headline range, tells you what a product change will really cost in time.
Do I need to send samples before ordering?
For anything other than a standard smooth paste in a standard tube, yes. Seal strength, registration and fill behaviour on your actual product are the three things that decide whether the machine works in your factory, and none of them can be confirmed from a catalogue.
What fill accuracy is realistic?
For servo piston dosing on a smooth paste, plus or minus one gram at a 10–150 ml fill is achievable. For high-viscosity or particulate products the achievable tolerance widens, and the honest answer depends on a test on your product rather than on a datasheet.
How long should commissioning take?
A single-station machine is usually running within a day of installation and a shift of operator training. An automatic line with a magazine, conveyor and several stations typically needs several days, and the first production run should be treated as a trial rather than as output.

Which tube filling machine for your product type?
Toothpaste, cosmetics, ointments and adhesives each load the filler differently.

Fully automatic mother-and-child tube filling & sealing
Dual-chamber tubes, two servo fillers, 10–150 ml per barrel, automatic tube feeding.

All four machines, with full parameters
The whole range on one page: tube sealing, tube filling, spouted pouches and pillow shrink wrapping.

Glossary: the words on a tube machine quotation
Thirty-nine terms defined the way buyers and line engineers actually use them — seal types, fill tolerance, eye mark, cap torque, Incoterms.

Related guides

Send the drawing — we will confirm the model and the tooling

Send the tube drawing or a physical sample and we will run it, then tell you which model, which tooling and what it will cost — before you commit to anything.

Request a quotation WhatsApp

Leave a Reply

Your email address will not be published. Required fields are marked *