This page explains the words that come up when you buy a tube filling or pouch filling machine — from the anatomy of a tube to the difference between a crimp seal and a fold seal, and from fill tolerance to changeover time. Written for buyers and line engineers, not for machine builders. Every term is defined the way it is actually used on a quotation or an inspection sheet.
If you are choosing a machine rather than reading a drawing, start with the four-machine overview or how to write a tube sealer specification. Come back here when a term in a quotation is unclear.
1. Tubes and containers
A tube is a container with a flexible body, a rigid shoulder and a nozzle opening. The words below describe the parts that decide which machine can handle it.
Laminated tube (ABL / PBL)
A tube whose body is a flat sheet of laminate, side-seam welded and cut to length, rather than a moulded cylinder. ABL uses an aluminium foil barrier layer; PBL replaces the foil with a plastic barrier such as EVOH. ABL gives a dead-fold and the best oxygen barrier; PBL gives better chemical resistance and a cleaner crack-free fold. Almost every pharmaceutical, cosmetic and adhesive tube made today is laminated. Our TY-001 and the mother-and-child machine both handle laminated tubes.
Extruded tube (PE tube)
A seamless tube body produced by extrusion, with the shoulder and nozzle moulded as one piece. Extruded tubes are cheaper in high volumes and common for hand cream, toothpaste and veterinary products. They behave differently on a sealing machine: the wall is thicker and rounder, so the sealing head has to be set for a seamless cylinder rather than a welded sheet.
Tube shoulder
The moulded part at the top of the tube that carries the nozzle and gives the tube its shape. It matters when you are filling, because the filling nozzle enters through the shoulder opening and the sealing machine holds the tube by it. Two supplier lots with different shoulder heights will sit differently in the locating block — a common cause of a seal that lands off-centre.
Orifice (nozzle opening)
The hole in the middle of the shoulder, quoted in millimetres. It sets the maximum filling speed, because the product has to pass through it twice — in during filling, and out when the customer uses the tube. A 6 mm orifice and a 10 mm orifice on the same tube fill at different rates.
Tube diameter
The flat width of the tube body, quoted in millimetres. 13.5 mm to 50 mm covers the great majority of tubes in production. A machine’s diameter range is not a marketing figure — the tube holder, the sealing jaws and the trim blade are all built for a specific band, and below or above it the tube simply will not sit straight. TY-001 is built for 15–50 mm.
Tube length
The body length from shoulder to open end, before sealing. It decides how much stroke the sealing head needs, and it is the number that most often gets left off a specification. A sealer set for 50–260 mm will not close on a 300 mm body without a change of hold-down.
Cap and cap type
The closure screwed onto the nozzle: flip-top, screw, stand-up, nozzle-tip or applicator. Caps are usually fitted by the filler, not the sealing machine, so on a tube line the cap decides whether you need a capper station or just a manual torque check.
Eye mark (colour mark)
A printed mark on the tube artwork that a sensor reads to position the tube before sealing. Without one, the tube is sealed wherever it happens to sit, and the seal will wander across the artwork from tube to tube. Eye marks must be printed with enough contrast, at the position the machine expects — a vague grey mark on a pale design is the single most common registration fault.
2. Filling
These are the terms that decide whether your fill weight is repeatable, and how much of the cycle time is spent filling rather than sealing.
Fill volume
The nominal amount of product put into each container, in millilitres or grams. On a quotation it is quoted as a range, because the same pump behaves differently at 5 ml and at 150 ml.
Fill tolerance
The permitted deviation from nominal fill volume, usually written as a percentage or as plus/minus millilitres. It is a machine property only up to a point — product viscosity, temperature and hopper level all move it. A tolerance that is tight enough to matter for a pharmaceutical product usually needs a servo piston pump, not a pneumatic one.
Servo piston pump
A positive-displacement pump where a servo motor drives the piston stroke. Because the stroke is set numerically, the fill volume is a recipe value rather than a mechanical adjustment — which is why servo pumps are what make multi-recipe production practical on a dual-chamber machine.
Snorkel filling (bottom-up filling)
A filling method where the nozzle travels down into the tube and rises as the product goes in, so the nozzle tip stays just above the liquid surface. It prevents foaming and stops product being trapped against the shoulder. For viscous products it is not optional — top filling leaves an air pocket that shows up as a short fill on inspection.
Suck-back (anti-drip)
A small reverse movement of the pump at the end of the fill that pulls the product tail back into the nozzle. Without it a drop hangs on the nozzle and lands on the tube mouth, which then seals badly. Most seal failures that look like a sealing fault are actually a suck-back setting that is too short.
Headspace
The air gap left between the product surface and the seal. It is a product decision (some products need room to expand) and a machine decision (the sealing jaws must not close on product). Product sitting in the sealing zone is what causes a weak, contaminated seal.
Changeover (format change)
Everything that has to be done between one product size and the next: swapping tube holders, adjusting the sealing stroke, loading a new recipe, re-teaching the eye mark. Quoted in minutes, and it is one of the few numbers on a machine specification that you can improve by how well you organise the line, not by spending more on the machine.
3. Sealing
Tube sealing is a welding process, not a gluing process. The two sides of the tube have to be melted together, which is why the tube construction decides whether a seal is possible at all.
Ultrasonic sealing
A sealing method that uses high-frequency mechanical vibration to melt the inner layer of the tube against itself. Because the heat is generated inside the material rather than applied from outside, it works through printed film and leaves a clean, narrow weld. It needs a thermoplastic inner layer — PE or PP — and it will not weld a paper or foil inner coating. TY-001 seals ultrasonically.
Hot-air (hot jaw) sealing
A sealing method that softens the tube end with a jet of hot air (or a heated jaw) and then closes the jaws on it. It is the older technology and still common on high-output lines. It is more tolerant of tube construction than ultrasonic, but it needs a warm-up period, and a machine that has just started is not yet at production quality.
Crimp seal
A seal made by pressing the tube end flat between a patterned jaw and an anvil, leaving a ribbed band. The pattern is what gives the seal its strength — a smooth seal looks neat and peels. Crimp seals are usually combined with a date code stamped in the same stroke.
Fold seal (fold-over seal)
A seal where the flattened tube end is folded over once and welded again, producing a rounded, thicker edge. It is the finish most cosmetic tubes use, because it hides the crimp pattern and looks better on shelf. The fold needs a folding blade and a second short weld, which is why a folding machine costs more than a plain crimper.
Trim (trim blade)
The cut that removes the ragged tail above the seal after welding. A blunt trim blade leaves a whisker or a saw-tooth edge, which is a cosmetic reject in most markets. Blade life depends on the tube material — an abrasive product wears it noticeably faster.
Seal strength (peel test)
How much force it takes to pull a finished seal apart, measured on a sample by hand or on a tensile tester. It is the check that catches a machine drifting out of parameter before the whole lot is sealed. A seal that peels cleanly usually means the inner layer never melted — energy too low, or the wrong tube.
Date code / batch code
The characters stamped into the seal in the same stroke — expiry date, batch number, or both. It is applied by type, hot-stamp ribbon or inkjet. A code that is legible but not crisp passes today and fails a retail audit later, so it is checked on the same sample as seal strength.
4. Spouted pouches
A spouted pouch is a different animal from a tube: the container arrives finished, and the machine only fills and caps it.
Spouted pouch (doypack with spout)
A stand-up pouch with a plastic spout welded into the top seam, used for liquids, purees and gels. The pouch is delivered pre-made with the spout already fitted, so the filling machine’s job is dosing and capping, not forming the pack.
Fitment / spout
The moulded plastic part welded into the pouch that the cap screws onto. Its bore and thread are the two dimensions that matter — a spout with a different thread will not take your cap, and a spout welded slightly off-centre will not present squarely to the filling head.
Premade pouch vs form-fill-seal
A premade pouch is bought finished and filled on a pouch filler; a form-fill-seal machine makes the pouch from roll film and fills it in one continuous cycle. Premade gives better print quality and lets you buy small lots; form-fill-seal gives lower cost per pack at high volume. The two are not interchangeable, and a quotation should say which one it is.
Cap torque
The turning force applied when the cap is screwed on, usually quoted in kilogram-centimetres or newton-metres. Too low and the cap leaks in transit; too high and the customer cannot open it, or the spout cracks. It is measured on a sample of ten with a torque gauge, not judged by feel.
Pouch clamp
The pair of jaws on the carousel that holds the pouch upright during filling. A worn clamp lets the pouch tilt, so the nozzle misses the spout and product ends up on the outside of the pack. Clamp wear is worth checking before blaming the dosing system for a short fill.
5. Shrink wrapping
Shrink wrapping
Wrapping a pack in a loose film that contracts around it when heated, holding the pack tight without a carton. It is used for multi-packs, for protecting boxed machines, and for bundling tubes into retail trays.
POF film (polyolefin)
A shrink film that shrinks evenly in both directions, does not yellow, and needs a relatively high tunnel temperature. It has largely replaced PVC in export packaging because it is accepted in more markets.
PVC film
A shrink film that works at a lower tunnel temperature and gives a stiffer pack, but yellows if overheated and is restricted in some markets. The tunnel must be set for the film actually loaded — changing from PVC to POF without changing the temperature is the classic cause of a “faulty wrapper” complaint.
Shrink tunnel
The heated chamber the wrapped pack passes through. Three things are set on it: temperature, belt speed and air circulation. Uneven shrink across a single pack points at airflow, not at temperature.
6. Line, commissioning and buying
Throughput vs cycle time
Throughput is finished units per minute; cycle time is the seconds one unit occupies. They are not the same number once a machine has more than one station. 7–13 tubes per minute on a semi-automatic sealer is a sealing rate, and the rate of the line is set by whichever station is slowest — usually the operator filling.
Change parts (format set)
The interchangeable tooling that adapts a machine to one container size: tube holders, jaws, trim blades, nozzles. Ask for the price of a second format set at the time of order — it is far cheaper then than two years later, and it is the difference between a machine that runs two products and one that runs one.
FAT / SAT
Factory Acceptance Test and Site Acceptance Test. FAT is the run in the builder’s workshop, against agreed samples and parameters, before shipment; SAT is the repeat after installation. Ask for the FAT checklist in advance — a test with no written criteria always passes.
Commissioning
The work of installing, levelling, connecting utilities, running the first production and training the operators. It is a separate item from delivery on most quotations, and it is where most of the risk in a first machine purchase sits.
Utilities (air, power)
What the machine needs from your building: air pressure and consumption, electrical supply and total connected load, floor loading and clearance. A machine quoted without these numbers cannot be laid out into a factory.
Incoterms (EXW, FOB, CIF)
The three-letter code that says where the seller’s responsibility ends. EXW means the buyer collects from the workshop; FOB means the seller delivers to the port and clears export; CIF adds freight and insurance to the destination port. Comparing two quotations without checking the Incoterm is comparing two different prices.
CE marking
The declaration that a machine meets the applicable European directives, backed by a technical file and a declaration of conformity. Ask which directives are cited and who signs the declaration — a CE sticker with no file behind it is not a CE marking.
Spare parts kit
The consumables and wear items worth holding on site from day one: trim blades, sealing jaws or anvil, tube holders, sensors, and the pneumatic seals that wear. A machine that stops for a two-dollar part is a machine that has stopped.
How to use this page
If a term here still does not resolve the question, send us the quotation line or the drawing and we will answer it against the actual machine — that is faster than working through a glossary.