Tube filling and sealing: 24 buyer questions, answered

Twenty-four answers to the questions that come up before a tube filling or sealing machine is ordered: which platform suits which pack, why a seal fails, what aluminium crimping needs, how output converts to capacity, what tooling costs and how long it takes, and what happens after the crate is opened. Each answer is written so it can be read on its own — the figures are the ones printed on the machine datasheets.

If your question is about price, the honest answer is that price follows five numbers: tube diameter, tube material, fill volume, output and print registration. Send those and the quotation stops being a range and starts being a figure. The rest of this page is about why those five numbers matter.

Choosing the machine

The platform decision is usually settled by the pack format and the number of tubes per shift, in that order.

Which machine do I need for plastic tubes?
For plastic and laminated tubes up to 15–50 mm in diameter, either platform works and the choice is volume: the semi-automatic ultrasonic sealer (TY-001) at 7–13 tubes per minute suits 3,000–15,000 tubes a day with an operator loading, and the fully automatic mother-and-child filler at 10–15 tubes per minute suits dual-chamber products where both barrels are filled in one pass.
Can one machine fill and seal at the same time?
On the mother-and-child platform, yes — filling, sealing, trimming and coding are one automatic cycle. The semi-automatic TY-001 is a sealer: tubes arrive already filled and the operator loads them one at a time. Buying a sealer when you also need filling means a separate filler upstream.
What is a mother-and-child tube, and why does it need its own machine?
A mother-and-child tube has two chambers in one barrel, so two products are dispensed together — two-component epoxy, hair colour, whitening cream, dental gel. It needs its own machine because the two barrels must be filled to matched levels: that ratio is the product, and a single-nozzle filler cannot hold it.
Do I need a fully automatic line for 5,000 tubes a day?
Usually not. At 5,000 tubes a day, a semi-automatic sealer run by one operator is typically the better economics — the automatic platform’s advantage is consistency and labour, and at that volume the labour saved does not cover the capital difference. The break-even discussion is set out in the semi-automatic vs fully automatic guide.

Tubes, materials and seals

Most seal failures are traced to the tube rather than the machine, which is why the material question comes first.

Why does my ultrasonic seal fail on some tubes?
Ultrasonic sealing needs a thermoplastic layer at the sealing interface. Laminated tubes with a PE or PP inner layer weld cleanly; tubes with a paper layer, a metallic inner coating, or an incompatible inner lacquer do not, and no amount of energy will fix that. The second cause is contamination — product on the sealing zone from overfilling or a dirty nozzle. If seals fail on part of a batch only, suspect the tube lot before the machine.
Can aluminium tubes be ultrasonically sealed?
No. Aluminium is not a thermoplastic, so it cannot be welded by ultrasonics. Aluminium tubes are closed by crimping and folding the tail, which is what the folding jaw set on the TY-001 and the mother-and-child platform does. A machine sold as an aluminium tube folding machine is doing a mechanical crimp, not a seal.
What tube diameter range is supported?
The semi-automatic TY-001 covers 15–50 mm sealing diameter and 50–260 mm tube length. The mother-and-child platform covers 13–50 mm sealing diameter. Outside those ranges the tooling has to be made for the tube, which is a tooling question rather than a machine question.
Does print registration affect which machine I need?
It affects the tooling and the price more than the platform. If the seal, date code or trim has to land in a fixed position relative to the artwork, the machine needs a registration sensor and the tube needs an eye mark printed to a known position. Tubes without an eye mark cannot be registered, and the seal lands wherever the tube sits.

Aluminium crimping and folding

Crimp quality is geometry: fold depth, jaw flatness and tail length, in that order of importance.

What fold depth should an aluminium tube crimp have?
Fold depth is set by the jaw set and matched to the tube wall thickness and the tail length left after filling. Too shallow and the fold opens under handling pressure; too deep and the tail cracks at the fold line. The correct depth for a given tube is established on a sample run and recorded on the parameter sheet.
What causes a cracked or split crimp?
Three usual causes, in order: jaw pressure set too high, a fold line that has been crimped twice, and tube wall thickness at the low end of the supplier’s tolerance. Repeated crimping of the same fold line is the common one — it happens when the tail length is set short and the machine folds on the same line twice to reach the required depth.
How long should the tail be before crimping?
The tail must be long enough to form the fold without pulling material out of the shoulder. If the tail is short, the crimp either fails to close or draws the shoulder in and distorts the print. This is why fill volume and tube length are confirmed before a quotation: a tube that is overfilled for its length will not crimp properly no matter how the machine is adjusted.
Is a folded aluminium tube as leak-tight as a welded tube?
For the products aluminium tubes normally carry — ointments, gels, dental products, adhesives — a correctly folded crimp holds for the product’s shelf life. It is not a weld, so it is not the right closure for low-viscosity liquids or products that generate internal pressure.

Output, changeover and capacity

Rated output and planning output are different numbers, and the gap is changeover.

How do I convert rated output into real capacity?
Take the rated figure, drop to the lower end of the range, then subtract changeover and cleaning time for the number of product changes per shift. A machine rated at 13 tubes per minute does not deliver 13 tubes per minute across an eight-hour shift with three product changes in it. Plan capacity on the shift figure, not the peak figure.
How long does a product changeover take?
A recipe change on the same tube size is a menu selection and a few minutes of checks. A change to a different tube diameter means changing or adjusting the tube holder and the sealing jaws, plus re-checking seal parameters — plan it in hours rather than minutes. Changeover time is the single largest reason a small operation should not automate: automated platforms are best when the run is long.
What limits output on the semi-automatic sealer?
The operator, not the machine. Loading one tube at a time sets the ceiling, which is exactly why the rated 7–13 tubes per minute range is wide: an experienced operator with consistent tubes sits at the top of it, and a first shift sits at the bottom. Tube loading ergonomics matter more than motor power at this scale.
Can the pouch machine run at the same speed as the tube machines?
The two are not comparable, because they count different units. The spouted pouch filler and capper is a dual-head machine rated on fill accuracy at ±1% rather than a headline packs-per-minute figure, and the shrink wrapper runs 30–150 packs per minute depending on pack size. Line balancing is a separate calculation, and it is one we will do with you if the four stations are bought as one line.

Tooling, lead time and ordering

Tooling is quoted separately from the machine, and it is what makes the machine fit a specific tube.

What tooling comes with the machine, and what is extra?
The standard platform ships with tooling for one tube size. Additional jaw sets or tube-holder sets for other diameters are quoted as separate line items, because they are machined per size. This is why a quotation that lists one machine price and no tooling usually means one tube size only.
How long is lead time?
Lead time is quoted per order rather than published as a fixed number, because it depends on two variables: whether the platform is a standard build and whether the tooling is standard for the tube size. A custom jaw set adds machining time before the machine can be test-run. Ask for the date with the quotation, and hold us to it in writing.
Do you need physical samples, or are drawings enough?
Drawings get a quotation; samples get a tested machine. A tube drawing gives diameter, length, wall and material, which is enough to price. What it does not give is how the tube behaves in the sealing jaws — samples do, and the sample run is what produces the parameter sheet.
Can the machine be built for a different voltage or plug type?
Yes. Supply voltage and frequency, plug type and machine labelling are confirmed at order. Not stating the destination voltage and frequency at order is a common and avoidable delay, because the electrical build cannot start until it is settled.

Installation, warranty and spare parts

What happens after the crate is opened decides whether the machine produces on day one or in week two.

What does installation involve?
The machine ships with a manual, wiring diagram and the parameter sheet from the sample run. Installation guidance and parameter setup are provided remotely, by video call or written, against that sheet. On the automatic platforms the first power-on is the moment to have the parameter sheet in hand rather than to start from factory defaults.
How long is the warranty?
Twelve months on the machine. Wear parts — sealing heads or sonotrodes, crimping jaws, trim blades, registration sensors, heater cartridges — are consumables and are not covered, which is why they are listed by part number on the spare-parts sheet so they can be stocked in advance.
Which spare parts should I stock from day one?
Trim blades and sealing jaws first, then registration sensors, then heater cartridges if the platform uses heat. How fast jaws wear depends on the product: an abrasive toothpaste wears jaws noticeably faster than a hand cream. The spare-parts sheet lists the wear items for the platform, and the honest advice is to stock the two cheapest wear items rather than the full list.
What is the response path when something stops?
The channel the order came in on — phone, WhatsApp or email, in English or Chinese. Describe the symptom rather than the suspected cause, and include a short video of the machine running if it runs at all. Intermittent stops are almost always a sensor or a pressure leak, and a video showing when it stops usually identifies which.

Related reading

How to specify a tube sealing machine
The five numbers that set the price, and how to write them into a request so the first reply carries a figure.

Aluminium tube folding machine: how the crimp works
Fold depth, jaw geometry, tail length and the defect patterns that tell you which parameter is wrong.

All machines and guides
The four platforms in one place, with the parameters that decide fit.

Question not answered here?

Send it with your tube specification and it gets answered by the person who builds and tests the machine.